Skip to product information
GPS Tracker for Dogs, 2 in 1 Pet Tracking Smart Collar (Only iOS), No Monthly Fee GPS Tracker Dog Collar, Real-time Location Comfortable PU Tracker Tag for Small, Medium Large Dogs(Locator Included)
$54.43
Shipping calculated at checkout.
About This
- 🟤✔️ No Monthly Fees & Free App - The Pet Finder comes with no service or monthly fees. If you’re an iOS user, our dog collar works seamlessly with the ‘Find My’ and ‘Maps’ apps at no additional cost.
- 🟤✔️ Real-Time Tracking & Location History - With this 2-in-1 GPS dog tracker collar, you won’t have to worry about your furry friend going out of sight, even if they wander off or get lost. Our live tracking collar lets you quickly and easily locate them. You can also see where your buddy has been and what they’ve been up to with this tracker. If you have any further questions, feel free to reach out to us!
- 🟤✔️ Adjustable Pet Collar Size - The MODUS dog tracking collar is designed for easy customization to fit your dog’s neck perfectly. Simply measure and cut it to the desired length. It's suitable for medium and large dogs.
- 🟤✔️ Lightweight, Durable & Waterproof Pet Finder - The dog tracker is crafted from nylon with a smooth PU surface for a sleek appearance. Plus, it is IP67 waterproof, so you don’t have to worry about rain, mist, snow, or water. This design helps extend the device's lifespan.
- 🟤✔️ Anti-Lost Function & Works with Apple Find My App - If your pet wanders off while playing outside, your iPhone, Apple Watch, iPad, or Mac will alert you when it’s detected in the Find My network. This feature helps prevent your pet from getting lost or stolen.
CARE & MAINTENANCE
To maintain the beauty and integrity of your purchase, we recommend treating it with care. Simple maintenance practices, such as gentle washing and proper storage, can effectively preserve the longevity of your favorites. We encourage you to refer to the care instructions included with each item, designed to help you keep your purchase in top condition.
SHIPPING & RETURNS
We strive to process and ship all orders in a timely manner, working diligently to ensure that your items are on their way to you as soon as possible. Need to return something? Just let us know.